TRIMESTRE | POSPAGO | PREPAGO | TOTAL | POSPAGO(%) | PREPAGO(%) |
2010-1T | 6.612.558 | 35.342.030 | 41.954.588 | 15,76% | 84,24% |
2010-2T | 6.862.703 | 35.819.942 | 42.682.645 | 16,08% | 83,92% |
2010-3T | 7.041.985 | 36.363.345 | 43.405.330 | 16,22% | 83,78% |
2010-4T | 7.336.461 | 37.141.192 | 44.477.653 | 16,49% | 83,51% |
2011-1T | 7.614.410 | 37.727.639 | 45.342.049 | 16,79% | 83,21% |
2011-2T | 7.840.424 | 38.474.285 | 46.314.709 | 16,93% | 83,07% |
2011-3T | 8.154.760 | 39.593.152 | 47.747.912 | 17,08% | 82,92% |
2011-4T | 8.473.911 | 37.726.510 | 46.200.421 | 18,34% | 81,66% |
2012-1T | 8.742.218 | 38.100.039 | 46.842.257 | 18,66% | 81,34% |
2012-2T | 8.971.118 | 38.914.258 | 47.885.376 | 18,73% | 81,27% |
2012-3T | 9.186.085 | 39.513.132 | 48.699.217 | 18,86% | 81,14% |
2012-4T | 9.433.571 | 39.632.788 | 49.066.359 | 19,23% | 80,77% |
2013-1T | 9.593.589 | 36.782.334 | 46.375.923 | 20,69% | 79,31% |
2013-2T | 9.835.556 | 37.478.130 | 47.313.686 | 20,79% | 79,21% |
2013-3T | 10.505.736 | 38.132.273 | 48.638.009 | 21,60% | 78,40% |
2013-4T | 10.752.274 | 39.542.840 | 50.295.114 | 21,38% | 78,62% |
2014-1T | 7.128.694 | 31.896.237 | 51.594.619 | 13,82% | 61,82% |
2014-2T | 10.935.758 | 41.258.254 | 52.194.012 | 20,95% | 79,05% |
2014-3T | 10.941.552 | 42.642.112 | 53.583.664 | 20,42% | 79,58% |
2014-4T | 11.043.533 | 44.287.194 | 55.330.727 | 19,96% | 80,04% |
2015-1T | 11.066.674 | 45.073.218 | 56.139.892 | 19,71% | 80,29% |
2015-2T | 11.106.578 | 44.875.878 | 55.982.456 | 19,84% | 80,16% |
2015-3T | 11.271.998 | 44.986.573 | 56.258.571 | 20,04% | 79,96% |
2015-4T | 11.448.739 | 45.878.731 | 57.327.470 | 19,97% | 80,03% |
2016-1T | 11.481.921 | 45.810.700 | 57.292.621 | 20,04% | 79,96% |
2016-2T | 11.691.144 | 46.236.268 | 57.927.412 | 20,18% | 79,82% |
2016-3T | 11.962.098 | 46.561.652 | 58.523.750 | 20,44% | 79,56% |
2016-4T | 12.112.732 | 46.572.192 | 58.684.924 | 20,64% | 79,36% |